Showing posts with label Floover Kampus Summer Splash. Show all posts
Showing posts with label Floover Kampus Summer Splash. Show all posts

Tuesday, July 15, 2014

Slide Out Flooring Continued...

This flooring project was completed today.
It has taken a bit longer due to the heat wave (109 degrees in the shade) and the special cuts that had to be made.